Twin Cities 952.442.2740 Southern MN 507.388.3288
Laketown Electric Co.
← All projects institutional

Westonka Performing Arts Center and Fieldhouse

A 72,000 SF addition and renovation at Mound Westonka High School where LEC served as Prime Electrical Contractor, adding an auditorium with theatrical and AV systems and a gymnasium.

Addition and renovation of the existing Mound Westonka High School that consisted of a 24,000 SF auditorium addition with state-of-the-art theatrical controls and lighting, AV systems, and architectural lighting features, as well as the addition of a 48,000 SF gymnasium.

Laketown also performed an electrical service upgrade that included relocating metering provisions to the exterior and installing custom switchgear to match the existing characteristics of the main switchgear.

Gallery

Get an estimate

Tell us about your project. We'll start the conversation.

Start the conversation